Our Work

Projects & Case Studies

A selection of projects demonstrating our full-lifecycle structural engineering capability across London's housing sector.

Structural Inspection Ground Investigation Piled Raft Design Construction Support Tekla Structural Designer Eurocode

Case Study 01

Subsidence Investigation & Piled Raft Remedial Design

Residential Housing Block, East London

Client London Borough of Newham
Location East London (Newham Borough)
Duration January 2025 — Ongoing

The Challenge

A four-storey residential housing block within the London Borough of Newham's portfolio presented signs of significant structural movement, including internal cracking, door frame distortion, and visible settlement at the building's perimeter. Residents raised concerns and the council required urgent independent structural assessment to determine the cause and extent of the problem and develop a safe, cost-effective remedial strategy.

Our Approach — Full Lifecycle Delivery

1
Structural Inspection

Detailed visual inspection across all floors and external elevations. Technical inspection report produced with findings, risk assessment, and recommended next steps.

2
Ground & Structural Investigation

Scoped and managed a ground investigation programme, coordinating soil testing and borehole surveys. Ground instability confirmed as primary cause of subsidence. Geotechnical data interpreted into clear engineering decisions for the council.

3
Remedial Design

Full piled raft foundation system designed using Tekla Structural Designer — 14 RC piles with 250mm raft slab, designed to Eurocode standards. Full calculations, reinforcement drawings, and construction specifications produced for contractor procurement.

4
Construction Support

Engineering support throughout construction — reviewing contractor proposals, responding to site queries, and inspecting works at key stages.

Our team managed the entire process — from the first inspection to a construction-ready remedial design — providing the council with clarity and confidence at every stage.

Outcome

The remedial scheme provided a permanent structural solution to a complex subsidence problem affecting occupied residential properties. The council was able to procure a specialist piling contractor using our construction-ready package, with confidence that the design was technically robust, fully compliant with Building Regulations and Eurocode standards, and deliverable within the existing building footprint with minimal disruption to residents.

Case Study 02

Structural Inspection of External RC Walkways

Residential Block, Newham

January 2026
Client London Borough of Newham
Location Jack Cornwell Street, East London
Structural Inspection Technical Reporting Remedial Recommendations

Visual structural inspection of cantilevered reinforced concrete external access walkways on a four-storey residential block. Identified defects including diagonal cracking to supporting beams, widespread soffit staining, biological growth, and water ingress attributed to failed waterproofing, poor drainage, and unsealed balustrade penetrations. Full technical report produced with findings, cause analysis, and a prioritised remedial works programme. No immediate structural instability identified.

Further project references available on request.

We are happy to discuss our experience in confidence. Contact us to find out more about our work with London local authorities and housing providers.